Anchorage
Alaska Projects Back
to map
Abbott
Loop Extension from Abbott Road to East 48th,
Anchorage: Green Engineering is preparing
utility relocation agreements for the project
to extend and reconstruct Abbott Loop road from
Abbott Road to East 48th Avenue. Project features
include bridging over the North and South forks
of Campbell Creek, trail under crossings, intersection
improvements, a separated pathway and other drainage
structures. DOWL is managing the project.
Huffman Road - Old Seward Highway to Lake
Otis Parkway: Green Engineering is preparing
the utility conflict report, providing an updated
environmental document and preparing permit applications
for DOWL Engineering. From New Seward Highway
to Lake Otis Parkway, Huffman Road will be three
lanes wide to accommodate a center left turn
lane. From New Seward Highway to Old Seward Highway,
Huffman Road will be widened to five lanes. Design
includes a multi-use path on the north side and
sidewalk on the south.
Klatt Road - New Seward Highway Pressure
Zone Intertie: Green Engineering is
responsible for agency coordination, permitting
and community awareness in support of the USKH
design.
Lake Hood General Aviation Parking relocation
and Lakeshore taxiway (Aircraft Drive) Separation
Projects - Ted Stevens Anchorage International
Airport: Green Engineering developed
safety plans to address airport operations and
the impacts of construction haulage on the public
road system provided environmental documentation;
and acquired project permits. These projects
managed by DOWL Engineering will facilitate general
aviation parking and siting a new field maintenance
facility and reduce aircraft automobile an pedestrian
conflicts. Client: DOWL Engineering
Lake Otis Parkway - 68th to Abbott Road
Placement Rehabilitation: Green Engineering
is preparing a utility conflict report for USKH.
Ninth
Avenue Surface Rehabilitation - L Street to
Ingra Street: Green
Engineering is performing utility conflict
analysis and preparing our environmental document
for project improvements as a subcontractor
to USKH.
Taxiway
Kilo Reconstruction, Ted Stevens International
Airport: USKH
work for Taxiway Kilo includes designing a
new structural section, expanding the safety
area drainage improvements, paving and lighting.
Green Engineering is preparing project specification,
the utility conflict report, erosion and sediment
Control Plans and Safety Plans for USKH. Client: USKH
Ted Stevens Anchorage Airport - Gates
N6 and N4: (USKH)
We
have worked on various transportation projects
throughout Alaska:
- Rural and remote airports
in St. Paul, St. George, Aniak, St. Mary's,
King Cove, Sand Point, Haines, Valdez, Cordova, Ketchikan,
and Northway.
- Utility relocation for projects
in Anchorage, Kodiak, Sitka and on the Parks Highway
- Environmental documentation
and permitting for highway projects in
Anchorage and the Matanuska-Susitna Borough.
- Environmental Compliance
Manager for the Glenn-Parks Interchange
- Design or construction support
in Yakutat, Togiak, Sand Point, Chignik,
Kodiak, Whittier, Fairbanks and Anchorage.
- Design
or environmental support for projects on the
Dalton, Glenn, Parks and Denali Highways.
|