About Us Engineering Geophysics

Anchorage Alaska Projects   Back to map

Abbott Loop Extension from Abbott Road to East 48th, Anchorage: Green Engineering is preparing utility relocation agreements for the project to extend and reconstruct Abbott Loop road from Abbott Road to East 48th Avenue. Project features include bridging over the North and South forks of Campbell Creek, trail under crossings, intersection improvements, a separated pathway and other drainage structures. DOWL is managing the project.

Huffman Road - Old Seward Highway to Lake Otis Parkway: Green Engineering is preparing the utility conflict report, providing an updated environmental document and preparing permit applications for DOWL Engineering. From New Seward Highway to Lake Otis Parkway, Huffman Road will be three lanes wide to accommodate a center left turn lane. From New Seward Highway to Old Seward Highway, Huffman Road will be widened to five lanes. Design includes a multi-use path on the north side and sidewalk on the south.

Klatt Road - New Seward Highway Pressure Zone Intertie: Green Engineering is responsible for agency coordination, permitting and community awareness in support of the USKH design.

Lake Hood General Aviation Parking relocation and Lakeshore taxiway (Aircraft Drive) Separation Projects - Ted Stevens Anchorage International Airport: Green Engineering developed safety plans to address airport operations and the impacts of construction haulage on the public road system provided environmental documentation; and acquired project permits. These projects managed by DOWL Engineering will facilitate general aviation parking and siting a new field maintenance facility and reduce aircraft automobile an pedestrian conflicts. Client: DOWL Engineering

Lake Otis Parkway - 68th to Abbott Road Placement Rehabilitation: Green Engineering is preparing a utility conflict report for USKH.

Ninth Avenue Surface Rehabilitation - L Street to Ingra Street: Green Engineering is performing utility conflict analysis and preparing our environmental document for project improvements as a subcontractor to USKH.

Taxiway Kilo Reconstruction, Ted Stevens International Airport: USKH work for Taxiway Kilo includes designing a new structural section, expanding the safety area drainage improvements, paving and lighting. Green Engineering is preparing project specification, the utility conflict report, erosion and sediment Control Plans and Safety Plans for USKH. Client: USKH

Ted Stevens Anchorage Airport - Gates N6 and N4: (USKH)


We have worked on various transportation projects throughout Alaska:

  • Rural and remote airports in St. Paul, St. George, Aniak, St. Mary's, King Cove, Sand Point, Haines, Valdez, Cordova, Ketchikan, and Northway.
  • Utility relocation for projects in Anchorage, Kodiak, Sitka and on the Parks Highway
  • Environmental documentation and permitting for highway projects in Anchorage and the Matanuska-Susitna Borough.
  • Environmental Compliance Manager for the Glenn-Parks Interchange
  • Design or construction support in Yakutat, Togiak, Sand Point, Chignik, Kodiak, Whittier, Fairbanks and Anchorage.
  • Design or environmental support for projects on the Dalton, Glenn, Parks and Denali Highways.

 

: : ENGINEERING : :

CLIENTS & LINKS
PROJECTS
PHOTOS
CONTACT US