ENGINEERING :: Aviation
Design :: Projects
AVIATION DESIGN
PROJECTS:
Ted Stevens Anchorage
Airport - Gates N6 and N4: (USKH)
Sand Point Airport,
Runway Rehabilitation - Phase 3: Green
Engineering is preparing project specifications
and coordinating the Safety Plan for construction
as a subcontractor to USKH. This project completes
work for runway rehabilitation and runway safety
area expansion.
Cordova Airport Apron,
Taxiway and General Aviation Improvements:
Airport design by USKH includes constructing
a new apron, extending a taxiway, installing EMAS,
upgrading the runway safety area, and general
aviation improvements. Green Engineering is
preparing project specifications and the Erosion
and Sediment Control Plan for USKH.
King Cove Airport
Improvements: Airport design by USKH
includes shifting the runway alignment, expanding
the runway safety area, drainage improvements,
resurfacing, lighting and providing a 2-bay
green SREB. Green Engineering is preparing
project specifications, the Erosion and Sediment
Control Plan and the Safety Plan.
T/W Kilo Reconstruction:
USKH work for Taxiway Kilo on Ted Stevens Anchorage International Airport includes designing
a new structural section, expanding the safety
area, drainage improvements, paving and lighting.
Green Engineering is preparing project specification,
the utility conflict report, Erosion and Sediment
Control Plans and Safety Plans for USKH. Client: USKH
Unalaska Airport
Environmental Impact Statement (EIS) :
Green Engineering is coordinating utilities
and roadway design for CH2M Hill's preliminary
design and environmental services as part of an EIS
for FAA.
Northway Airport:
The project will reconstruct and pave the runway,
taxiway, and apron damaged in the 2002 Denali Fault earthquake.
Green Engineering is supporting USKH's engineering
efforts by preparing the project scoping report
and preparing project specifications. USKH is
providing engineering and environmental services
for this project. |