Alpha
list of Engineering projects. Back
to map
Abbott
Loop Extension from Abbott Road to East 48th,
Anchorage: Green Engineering is preparing
utility relocation agreements for the project
to extend and reconstruct Abbott Loop road from
Abbott Road to East 48th Avenue. Project features
include bridging over the North and South forks
of Campbell Creek, trail under crossings, intersection
improvements, a separated pathway and other drainage
structures. DOWL is managing the project.
Bethel
Chief Eddie Hoffman Highway Rehabilitation and
Separated Pathway: Green Engineering
is preparing the utility conflict report and
coordinating conflict resolution for R&M
Consultants' design work.
Chignik
Airport Access Road Rehabilitation: Green Engineering is analyzing traffic and
safety as a subcontractor to BEESC. This project
will rehabilitate 0.9 miles of existing road
to current design standards with realignments
as necessary along rock bluffs to minimize
maintenance efforts and provide a dependable
year-round access to the airport, which is
the community's only link to other parts of
the state. The design coordinates coastal engineering
for armor rock slope protection, geotechnical
recommendations for rock fall and rock cutting
issues, hydraulic engineering for fish passage
at stream crossings, and right-of-way mapping.
Cordova Airport Apron, Taxiway and General
Aviation Improvements: Airport design
by USKH includes construction a new apron, extending
a taxiway, install EMAS, upgrading the runway
safety area, and general aviation improvements.
Green Engineering is preparing project specification
and the Erosion and Sediment Control Plan for
USKH.
Glenn - Parks Interchange: Green
Engineering is providing environmental engineering
services for Kiewit Pacific Co. for this design-build
facility. Work includes developing the erosion
and sediment control plan, the storm water pollution
prevention plan, permit application(s) for the
northern most anadromous fish stream, providing
environmental compliance training and monitoring,
and permitting borrow, and disposal sites and acquiring
permit modifications for the Corps of Engineers
??? 404 permit as required.
Huffman Road - Old Seward Highway to Lake
Otis Parkway: Green Engineering is preparing
the utility conflict report, providing an updated
environmental document and preparing permit applications
for DOWL Engineering. From New Seward Highway
to Lake Otis Parkway, Huffman Road will be three
lanes wide to accommodate a center left turn
lane. From New Seward Highway to Old Seward Highway,
Huffman Road will be widened to five lanes. Design
includes a multi-use path on the north side and
sidewalk on the south.
Ketchikan Airport: USKH is providing
environmental and engineering services to improve
the runway safety area and provide a pavement overlay
for runway. Green Engineering is supporting environmental
services in the permitting and agency consultations
??? efforts.
King Cove Airport Improvements: Airport design by USKH includes shifting the runway
alignment, expanding the runway safety area, drainage
improvements, resurfacing, lighting and providing
a 2-bay green SREB. Green Engineering is preparing
project specifications, the Erosion and Sediment
Control Plan and the Safety Plan.
Klatt Road - New Seward Highway Pressure
Zone Intertie: Green Engineering is
responsible for agency coordination, permitting
and community awareness in support of the USKH
design.
Lake Hood General Aviation Parking relocation
and Lakeshore taxiway (Aircraft Drive) Separation
Projects - Ted Stevens Anchorage International
Airport: Green Engineering developed
safety plans to address airport operations and
the impacts of construction haulage on the public
road system provided environmental documentation;
and acquired project permits. These projects
managed by DOWL Engineering will facilitate general
aviation parking and siting a new field maintenance
facility and reduce aircraft automobile an pedestrian
conflicts. Client: DOWL Engineering
Lake Otis Parkway - 68th to Abbott Road
Placement Rehabilitation: Green Engineering
is preparing a utility conflict report for USKH.
Ninth Avenue Surface Rehabilitation -
L Street to Ingra Street: Green Engineering
is performing utility conflict analysis and
preparing our environmental document for project
improvements as a subcontractor to USKH.
Northern Region Airports: Green
Engineering is supporting DOWL's work to provide
environmental documents and wetlands analyses on
several Northern Region airports. As part of this
work, they are working on the Environmental Assessment
for St. Mary's Airport and conducted field work
on the airports at Ruby and Nulato.
Northway Airport: The project
will reconstruct and pave the runway, taxiway,
and apron damaged in the 2002 earthquake. Green
Engineering is supporting USKH's engineering efforts
by preparing the project scoping report and preparing
project specifications. USKH is providing engineering
and environmental services for this project.
Old Glenn Highway - N. Eagle river Intersection
to Peters Creek: Green Engineering is
preparing utility relocation agreements for CRW
Engineering on this reconstruction project.
Parks Highway, MP 44-52: Green
Engineering is leading environmental tasks for
HDL. Environmental and preliminary engineering
activities are underway for the Parks Highway from
Milepost 44, Lucas Road, to Milepost 52, Big Lake
Road. Improvements may include a 4-land highway
and safety and capacity improvements, road surface
and subbase improvement, drainage, pedestrian and
bicycle facilities.
Parks
Highway, MP
72-83 Willow to Kashwitna: Green Engineering is preparing
a utility conflict report for this rehabilitation
project as a subcontractor to HDL.
Sand Point Airport
Runway Rehabilitation - Phase 3: Green
Engineering is preparing project specification
and coordinating the safety plan
for construction as a subcontractor to USKH.
This project completes work for runway rehabilitation
and runway safety area expansion.
Seward Meridian Reconstruction - Parks
Highway to Seldon Road - Environmental Services: Green Engineering is providing peer review and
quality control for project engineering reports.
The project proposes to upgrade the existing
2-mile portion of the Seward meridian Parkway
between the Parks Highway and Bogard Road, and
to extend the road one mile from Bogard Road
to Seldon Road. Intersection improvements at
the Palmer-Wasilla Highway and Bogard Road, pedestrian
amenities, and replacement of the Cottonwood
Creek crossing are also included. CH2M Hill is
the project manager.
Ted Stevens Anchorage Airport - Gates
N4, N6 and N8: Green Engineering is working with USKH on design for improvements of Gates N4, N6 and N8 for the North Terminal of Ted Stevens Anchorage International Airport. Work includes preparation of project specifications and const5ruction safety and phasing plans.
T/W Kilo Reconstruction: USKH work for Taxiway Kilo includes designing
a new structural section, expanding the safety
area drainage improvements, paving and lighting.
Green Engineering i preparing project specification,
the utility conflict report, erosion and sediment
Control Plans and Safety Plans for USKH. Client: USKH
Unalaska Airport
Environmental Impact Statement (EIS): Green Engineering is coordinating utilities
and roadway design for CH2M Hill's preliminary
design and environmental services for the EIS
for FAA.
We
have worked on various transportation projects
throughout Alaska:
- Rural and remote airports
in St. Paul, St. George, Aniak, St. Mary's,
King Cove, Haines, Valdez, Cordova, Ketchikan,
and Northway.
- Utility relocation for projects
in Anchorage, Sitka and on the Parks Highway
- Environmental documentation
and permitting for highway projects in
Anchorage and the Matanuska-Susitna Borough.
- Environmental Compliance
Manager for the Glenn-Parks Interchange
- Design or construction support
in Yakutat, Togiak, Sand Point, Chignik,
Kodiak, Whittier, Fairbanks and Anchorage.
- Design
or environmental support for projects on the
Dalton, Glenn, Parks and Denali Highways.
|