About Us Engineering Geophysics

ENGINEERING :: Highway Design :: Projects

HIGHWAY DESIGN PROJECTS:

Chignik Airport Access Road Rehabilitation: Green Engineering is analyzing traffic and safety and preparing specifications as a subcontractor to BEESC. This project will rehabilitate 0.9 miles of existing road to current design standards with realignments as necessary along rock bluffs to minimize maintenance efforts and provide a dependable year-round access to the airport, which is the community's only link to other parts of the state. The design coordinates coastal engineering for armor rock slope protection, geotechnical recommendations for rock fall and rock cutting issues, hydraulic engineering for fish passage at stream crossings, and right-of-way mapping.

Seward Meridian Reconstruction - Parks Highway to Seldon Road - Environmental Services: Green Engineering is providing peer review and quality control for project engineering reports. The project proposes to upgrade the existing 2-mile portion of the Seward Meridian Parkway between the Parks Highway and Bogard Road, and to extend the road one mile from Bogard Road to Seldon Road. Intersection improvements at the Palmer-Wasilla Highway and Bogard Road, pedestrian amenities, and replacement of the Cottonwood Creek crossing are also included. CH2M Hill is managing the project.

 

  : : ENGINEERING : :

CLIENTS & LINKS
PROJECTS
PHOTOS
CONTACT US